GERRY: Well from, from the script and from the script breakdown comes the scheduling, the budget breakdown, the list of things that have to be done by certain deadlines and then we just start working through them as we'll find a location we'll survey it, photograph it, make notes as to what has to be done and make up a sort of job sheet like a shopping list of, these are, this is the amount of construction work that needs to take place in this location to make it work, this is the amount of money that needs to be spent on props, this is the amount of time that needs to be put in to it and they go back into the melting pot so I have charts running all the time and I can keep feeding this information into it so that if any one location looks like going above my original estimate, I know that I have to claw back on a future location, it has to be done simpler so I can sort of keep control of it that way and basically we just keep working as, as we go, we keep surveying, measuring, we produce

Additional notes in pen and pencil:

Annotation 1: In pen, there are lines surrounding the text from 'as we'll find' on the fourth line to 'of it that way' on the seventeenth line. To the top right of the surrounded text, the number '10' is written and circled.

Annotation 2: To the left-hand side of the surrounded text, the words 'Part 4 picking up from P.8.' is hand-written. In the bottom left of the surrounded text, the words 'go to p11' is hand-written.

Annotation 3: In pencil, to the left of the second line, the word 'process' is written.

Annotation 4: Throughout the text, there are a number of sentences underlined in pencil: